LNG carrier conversion / conversion-based FSRU

An existing carrier hull reused as floating import infrastructure.

Compare

Class overview

A conversion-based FSRU takes an existing LNG carrier and adds regasification topsides, mooring modifications and send-out systems. The containment system, hull condition and machinery are inherited from the original vessel, so each conversion is a distinct engineering case. Some conversions retain the ability to return to trading service; others do not.

Classification

Operational role
LNG Carrier Conversion / Conversion-Based FSRU
Containment system
GTT NO96 Membrane · GTT Mark III Membrane · Moss / Spherical Self-Supporting Type B
Tank geometry
Inherited from the original carrier — membrane prismatic or spherical
Capacity class
Conventional — indicative: approximately 125,000–180,000 m³
Propulsion options
Steam turbine · DFDE / TFDE
BOG management
BOG as fuel · Gas combustion unit

Key systems

ContainmentOriginal cargo containment system retained after survey and repair
RegasificationAdded vaporisers, high-pressure pumps and send-out metering
MooringJetty, side-by-side or turret arrangement selected for site conditions

Operational environment

Import projects reusing an existing LNG carrier hull as floating regasification capacity.

Safety and operational considerations

  • The converted unit inherits the containment system, hull condition and age of the original carrier.
  • Added regasification topsides change weight distribution, power demand and hazardous-area layout.
  • Some conversions retain the ability to return to trading service, subject to project design.

Strengths

  • Reuses an existing hull and containment system
  • Can support phased import capacity where onshore terminals are not yet built
  • May retain carrier capability depending on the conversion scope

Considerations

  • Inherits the age, condition and containment characteristics of the original ship
  • Added topsides change weight distribution, power demand and hazardous-area layout
  • Send-out capability and mooring limits are entirely project-specific

Technical information

Status
Educational overview — editorial review required
Seeded educational summary awaiting editorial and technical review.
Last reviewed
15 September 2026
Source status
Sources pending editorial review.

Technical parameters are indicative and may vary by vessel design, generation, shipyard, operator and intended service.