Carrier library
LNG Carrier Conversion / Conversion-Based FSRUConventionalEducational data
LNG carrier conversion / conversion-based FSRU
An existing carrier hull reused as floating import infrastructure.
Class overview
A conversion-based FSRU takes an existing LNG carrier and adds regasification topsides, mooring modifications and send-out systems. The containment system, hull condition and machinery are inherited from the original vessel, so each conversion is a distinct engineering case. Some conversions retain the ability to return to trading service; others do not.
Classification
- Operational role
- LNG Carrier Conversion / Conversion-Based FSRU
- Containment system
- GTT NO96 Membrane · GTT Mark III Membrane · Moss / Spherical Self-Supporting Type B
- Tank geometry
- Inherited from the original carrier — membrane prismatic or spherical
- Capacity class
- Conventional — indicative: approximately 125,000–180,000 m³
- Propulsion options
- Steam turbine · DFDE / TFDE
- BOG management
- BOG as fuel · Gas combustion unit
Key systems
ContainmentOriginal cargo containment system retained after survey and repair
RegasificationAdded vaporisers, high-pressure pumps and send-out metering
MooringJetty, side-by-side or turret arrangement selected for site conditions
Operational environment
Import projects reusing an existing LNG carrier hull as floating regasification capacity.
Safety and operational considerations
- The converted unit inherits the containment system, hull condition and age of the original carrier.
- Added regasification topsides change weight distribution, power demand and hazardous-area layout.
- Some conversions retain the ability to return to trading service, subject to project design.
Strengths
- Reuses an existing hull and containment system
- Can support phased import capacity where onshore terminals are not yet built
- May retain carrier capability depending on the conversion scope
Considerations
- Inherits the age, condition and containment characteristics of the original ship
- Added topsides change weight distribution, power demand and hazardous-area layout
- Send-out capability and mooring limits are entirely project-specific
Technical information
- Status
- Educational overview — editorial review required
- Seeded educational summary awaiting editorial and technical review.
- Last reviewed
- 15 September 2026
- Source status
- Sources pending editorial review.
Technical parameters are indicative and may vary by vessel design, generation, shipyard, operator and intended service.