OSSA LNG
All technology topics

Engineering knowledge · Membrane containment

GTT Mark III: the layers behind the LNG

Understand the containment system, its design evolution and the questions that matter when thermal performance meets ship operation.

  • Mark III
  • Mark III Flex
  • Mark III Flex+
  • Cargo containment

Public-source research reviewed: · Educational content

What Mark III is

Mark III combines containment and insulation in a membrane system supported by the inner hull. Its primary barrier is corrugated 304L stainless steel, 1.2 mm thick; a complete composite secondary barrier sits within prefabricated insulation panels.S1

The thin liner is supported rather than functioning as an independent structural tank. Cargo loads pass through the containment assembly to the ship’s structure.S2

Inside the tank wall

Conceptual wall section

Mark III conceptual containment layersFrom LNG cargo to inner hull: primary membrane, primary insulation, secondary composite barrier, secondary insulation, simplified support interfaces and inner hull. Heat flows from hull toward cargo; structural loads pass toward hull. Schematic not to scale, not a construction detail.LNG cargo1. Primary membrane2. Primary insulation3. Secondary composite barrier4. Secondary insulation5. Simplified support interfaces6. Inner hullHeat toward cargoStructural loads through assembly toward hull
From cargo toward hull: primary membrane → primary insulation → composite secondary barrier → secondary insulation → support interfaces → inner hull. Heat flows toward the cargo; structural loads pass toward the hull. Simplified educational description, not a construction drawing. Schematic not to scale, not construction detail. Sources: S1S2

The secondary barrier

GTT’s technical paper describes a laminated barrier with aluminium between glass-cloth-and-resin layers. Its role is to keep cryogenic liquid away from the inner hull following a primary-barrier leak.S2

A complete secondary barrier is a protective layer, not permission to continue normal operation after damage.

The insulation also carries load

Reinforced polyurethane panels provide thermal resistance and load-bearing support. Bonding and support interfaces form part of the load path to the hull.S2

The engineering question is not only how much heat enters, but how the assembly transmits loads without losing containment integrity.

Mark III, Flex and Flex+

GTT publishes the following family-level reference figures for a 170,000 m³ vessel. These are project-dependent design values, not universal measurements of ships in service.S1

GTT family-level reference · 170,000 m³ vessel
VariantPanel thickness
primary + secondary
Published BOR
% volume/day
Mark III270 mm
100 + 170 mm
0.125–0.15
Mark III Flex400 mm
100 + 300 mm
0.085–0.10
Mark III Flex+480 mm
100 + 380 mm
0.07

GTT’s 2017 release identifies both thicker insulation and an enhanced secondary-barrier arrangement in Flex+. It reports general approval at that time.S3

Read the conditions before comparing the number.

GTT identifies vessel size, tank arrangement and reinforcements as factors affecting BOR. The actual project specification and guarantee conditions are needed for a like-for-like assessment.S1

Why containment and BOG belong in the same discussion

Heat entering the cargo contributes to natural evaporation. Insulation limits that heat transfer and protects the hull from cryogenic temperatures.S2 The resulting vapour has to be managed within the ship’s gas-handling and energy system. DNV highlights the coupling between BOG fuel use and reliquefaction, which itself consumes energy.S4

Engineering question

When gas demand is high

How does natural vapour generation compare with the intended gas demand? If extra gas is required, what does the approved fuel-gas arrangement provide, and at what energy cost?

Engineering question

When gas demand falls

What happens to surplus vapour during slow steaming, waiting or a change in machinery load? Compare the actual gas-management arrangement, not just the advertised BOR.

Sloshing: an assessment of the complete tank system

Liquid motion creates impact loads that must be considered alongside the strength of the containment assembly. DNV’s historical methodology description includes insulation, inner hull, pump tower and tower supports in that assessment. It also discusses model-test scaling and statistical treatment of impact loads.S5

GTT’s offshore application guidance explains that FSRU and FSU designs require consideration of intermediate filling levels, site exposure and mooring arrangement; reinforcement is selected for those loads.S6

No universal filling window on this page.

Do not turn a generic explanation into a permitted loading range. Filling restrictions and operating limits must come from the approved documentation for the particular vessel and service. The cited 2014 DNV announcement is historical methodology background, not the current rulebook.

Mark III and NO96: different construction principles

Construction principles, not a performance ranking
FeatureMark III familyNO96 family
Primary membraneCorrugated 304L stainless steel, 1.2 mmInvar, 36% nickel-steel alloy, 0.7 mm
Secondary barrierComplete composite barrierSecond Invar membrane
Insulation descriptionReinforced foam-and-plywood panelsConstruction depends on the NO96 variant; compare the named version
Comparison boundarySpecify the generation, tank arrangement, reference conditions and service profile before comparing thermal performance.

Construction facts: GTT Mark III and NO96 descriptions.S1S7

Applications: check the actual project

Delivered vessel

Al Shelila · Mark III Flex

DNV reported delivery of the 175,000 m³ carrier on 29 November 2024 and identified Mark III Flex with a published BOR of 0.085%/day.S8

A delivered example confirms application. The announcement is not a voyage-by-voyage performance dataset.

Floating infrastructure

FSRU and FSU

GTT identifies both Mark III and NO96 as options for floating storage and regasification projects. The service and exposure determine the assessment required.S6

A carrier-to-FSRU conversion needs its own engineering review; the original containment name does not establish suitability.

Developments worth following

Dated technical context selected for this article. These cards are researched static background, not a connected live Daily News feed.

20 May 2026 · Announced project

Three tanks, 177,000 m³, Mark III Flex

GTT announced four BW LNG newbuilds with a three-tank arrangement, a project BOR guarantee of 0.08%/day and deliveries scheduled from Q4 2028. It attributes improved thermal performance partly to the cargo-volume-to-insulation-area relationship.S9

3 June 2025 · Design approval milestone

Pressure-rated LNG fuel tanks are a separate application

GTT reported DNV Approval in Principle for a 1 barg membrane fuel-tank design and referenced earlier 2 barg approval for smaller tanks, notably cruise-ship applications.S10

19 January 2023 · Monitoring concept

Digital sloshing assessment and survey planning

GTT reported Lloyd’s Register AiP for a solution combining operational data, a tank digital twin and risk analysis to support alternative survey planning.S11

Questions professionals should ask

  • Which Mark III variant and which tank arrangement are actually specified?
  • What are the reference conditions behind the BOR guarantee?
  • How is containment matched to gas demand and vapour recovery?
  • What operating limits apply to the intended loading pattern?
  • Does a reported benefit come from a model, approval, guarantee or measured service result?

Frequently asked questions

Sources and evidence

All sources below were opened during preparation on 12 October 2026. Product-page publication dates are unspecified. Manufacturer claims are identified as such; classification announcements are not independent operating-performance tests.

  1. S1GTT · Mark III technologies

    Product description and reference table. Undated.

    Read source (opens in a new tab)
  2. S2Gavory and de Sèze / GTT · Sloshing in membrane LNG carriers and its consequences from a designer’s perspective

    Historical technical paper (2009; hosted filename includes later dates). Used for construction principles, not current dimensional specifications or operating limits.

    Read paper (opens in a new tab)
  3. S3GTT Inside #11

    25 October 2017. Flex+ development history.

    Read source (opens in a new tab)
  4. S4DNV · Overcoming the EEXI challenge for LNG carriers

    Used only for machinery/BOG integration context, not a current compliance ruling.

    Read source (opens in a new tab)
  5. S5DNV · Revised version of Class Note 30.9

    5 September 2014. Historical methodology announcement, not the current class standard.

    Read source (opens in a new tab)
  6. S6GTT · FSRU & FSU

    Undated application guidance.

    Read source (opens in a new tab)
  7. S7GTT · NO96 technologies

    Undated product description.

    Read source (opens in a new tab)
  8. S8DNV · Delivery of Al Shelila

    29 November 2024.

    Read source (opens in a new tab)
  9. S9GTT · Three-tank large-scale LNG carriers

    20 May 2026. Scheduled newbuild project.

    Read source (opens in a new tab)
  10. S10GTT · DNV AiP for 1 barg membrane fuel tanks

    3 June 2025.

    Read source (opens in a new tab)
  11. S11GTT · Lloyd’s Register AiP for maintenance optimisation

    19 January 2023.

    Read source (opens in a new tab)