Membrane-type LNG carrier
The volumetric workhorse behind most modern LNG newbuilds.
Class overview
Membrane carriers use a thin primary barrier supported directly by the inner hull, with the insulation carrying the cargo load. GTT NO96 and Mark III systems dominate the order book because they maximise cargo volume for a given hull and deliver very low boil-off with modern insulation.
Classification
- Operational role
- Conventional Ocean-Going LNG Carrier
- Containment system
- GTT Mark III Membrane · GTT NO96 Membrane
- Tank geometry
- Hull-conforming prismatic membrane tanks
- Capacity class
- Conventional — indicative: approximately 125,000–180,000 m³
- Propulsion options
- ME-GI · X-DF · DFDE / TFDE · Steam turbine
- BOG management
- BOG as fuel · Gas combustion unit · Reliquefaction
Key systems
ContainmentCorrugated stainless or invar primary barrier bonded to insulation panels
InsulationReinforced polyurethane foam or perlite-filled plywood boxes
Cargo handlingFull reliquefaction or boil-off gas routed to the main engines as fuel
Operational environment
Baseload ocean transport between major liquefaction and import terminals.
Safety and operational considerations
- Membrane integrity monitoring and barrier space management are central to safe cargo operation.
- Filling-level and sloshing guidance is project-specific and defined in the vessel's operating manuals.
- Membrane repair requires qualified personnel and controlled conditions.
Strengths
- Best cargo volume per metre of hull, lowering unit freight cost
- Very low boil-off with reinforced insulation systems
- Broad shipyard availability and a deep spares ecosystem
Considerations
- Filling-level restrictions on some systems to avoid sloshing loads
- Primary barrier repairs require specialist yard capability
Technical information
- Status
- Educational overview — editorial review required
- Seeded educational summary awaiting editorial and technical review.
- Last reviewed
- 15 September 2026
- Source status
- Sources pending editorial review.
Technical parameters are indicative and may vary by vessel design, generation, shipyard, operator and intended service.